Site access
Record gate and aisle widths and permitted entry times. Describe the ground, work point and facility requirements.
Size and power
State the working height, expected load and work environment. Ask the team to confirm a model and size; capacity cannot be inferred from a photo.
Timing and follow-up
Specify the period, quantity and start date. Retain the enquiry reference for follow-up.
A guide to preparing an enquiry and reviewing options; it does not replace machine documents or onsite specialist review.
